
KanapyInspection notes
Water loss — East Wing,
Level 2
Secure access through Kanapy
Product · how it works
Kanapy turns what you capture on site into the notes, the photo log and the next step. Nothing gets typed twice.
The Kanapy film
A loss, the record that grows around it, and the approval at the end. Sound on.
How it fits together
You open one thing. What you capture lands in the project record, your KanapyCrew reads it with you and drafts the notes in your words, and the file moves on with the proof attached.
On site
With your Crew
Inspection Notes · Riverside restoration
Prepared for Sterling Mutual, claim RVR-2026-0312
Date of loss 9 March 2026Inspected 12 March 2026Issued 13 March 2026
Water intrusion along the east wall. Attributed to wind-driven rain at the second window head (on or about 9 March 2026). (Fig. 1)
Share from the same record
Network
Every sub's COI, every engineer's license, every certification lands with the person the day they show up. Kanapy keeps the documents beside the name and flags each one before it lapses, so the next job starts with everyone current.
Who you answer to
They text you. You answer in a minute, in your own words, with the file attached, drafted from the record you already keep.
Beta
Kanapy works for one person on one project. Bring yours, see how it holds up, then decide.
TodayDay 30 · you decide
Inspection is nextTake the first photo
To start
Not needed